Guangming Water Plant currently operates at 200,000 m³/day. This project aims to build a conventional treatment and sludge system with a capacity of 300,000 m³/day, supporting a future deep treatment process of 500,000 m³/day, focusing on high quality, value, and intelligence.
This project includes ozone and liquid oxygen dosing system, PAC dosing system, activated carbon dosing system, sodium hydroxide dosing system, sodium hypochlorite dosing system, and carbon dioxide dosing system.

The Guangming Smart water plant construction project has realized the automatic control of the whole process of the water plant, digital operation and maintenance management, and asset life cycle management through the upgrading of the five major sectors of “automatic control system upgrading and transformation, plant-wide digital security linkage, digital operation and control platform, asset management optimization and integration, and process intelligent algorithms”.Integrated safety control, safe and reliable production and operation, excellent and stable water quality.

Related project recommendations