Qiankeng Pumping Station is the water intake pumping station of Longhua Qiankeng Water Plant (design scale of 230,000 cubic meters/day). The renovation project of the powdered activated carbon dosing system of the Qiankeng Pumping Station intends to build a new powdered activated carbon dosing system at the Qiankeng Pumping station.
The construction content of the powdered activated carbon dosing system project of Qiankeng pumping station includes the construction of powdered activated carbon silos, preparation tanks, and liquid storage tanks, the installation of powdered activated carbon dosing equipment and facilities (dosing metering pumps, etc.), the layout of dosing pipelines (dosing pipelines, pipe ditches, etc.), and electrical (control cabinets, cables, etc.).And auxiliary materials, etc.), automatic control, monitoring systems, etc.
Shenzhen Langgerry Industrial Development Co., Ltd. All rights reserved Guangdong ICP No. 2020097557